play_arrow

keyboard_arrow_right

Listeners:

Top listeners:

skip_previous skip_next
00:00 00:00
playlist_play chevron_left
volume_up
  • cover play_arrow

    LISTEN TO CJMQ 88.9FM CJMQ 88.9FM

  • cover play_arrow

    Daily News Update August 28, 2024 Robot Heart

  • cover play_arrow

    La Maison Aube-Lumière Sets Record with $63,000 Fundraiser in 20th Thrift Shop Edition Derek Bullard

  • cover play_arrow

    La Maison Aube-Lumière Sets Record with $63,000 Fundraiser in 20th Thrift Shop Edition Derek Bullard

Communications

Full Closure of Route 147 in Compton Due to Construction

todayOctober 1, 2024 3

Background
share close

Compton, September 30, 2024 – A section of Route 147 in Compton is closed for construction and will remain shut until October 18, 2024, according to the Ministry of Transport and Sustainable Mobility. The closure is for the reconstruction of a culvert located between Compton and Coaticook. Motorists are being rerouted via Cochrane Road, while heavy vehicles must take a 16-kilometer detour via Routes 206, 251, and Moe’s River Road. Local traffic is permitted, and drivers are urged to follow speed limits and signage.

Source: Ministère des Transports et de la Mobilité durable

Sign up to our newsletter

Written by: Derek Bullard

Rate it

Post comments (0)

Leave a reply

Your email address will not be published. Required fields are marked *


0%